Medical Plastics Plant Manager Recruited in 26 Days to Lead a Zero-Deviation FDA Audit and Restore GMP Control
A U.S.-based medical plastics manufacturer faced a critical leadership failure at the worst possible moment. With an FDA inspection already scheduled, the sudden departure of the Plant Manager left the facility without centralized operational authority during a high-risk regulatory window.
Within 26 days, PlasticStaffing recruited and placed an experienced Medical Plastics Plant Manager who led the facility through a successful FDA audit with zero major deviations, restored GMP control across the plant, and stabilized operations in a highly regulated manufacturing environment.